Facebook   GooglePlus  StumbleUpon   Twitter   Pinterest
search
Login | Signup | Support
  • 0
  • Powerpoint Slides : Kanban >> Browse by Author >> Browse by Institute
     
    Downloads: 842
    Operating Decisions The Kanban System Operating Decisions The Kanban System
    Downloads: 406
    Models of Heijunka-levelled Kanban-Systems The difference between the available capacity c and the idle capacity zi is the demand of parts which is requested from the supplier to replenish the raw ...
    1

    Copyright © 2014 www.slideworld.com. All rights reserved.